Sqn Building Closures

Yeah I was catching up :rofl:

But like RFCAs with electrical inspections

5 Likes

Is that just today’s list? Between 80-90 is the figure I’ve heard from someone this evening.

Around 140 total nationally.

W&W running a townhall with the RC about what’s going on week after next. I make no attempt to minimise what uitterly incompetent nonense the whole situation is*, but fair play to HQ and Rgns for their comms.

Much better than their standard reputation, I was a cadet for the Great Implosion Of SW Region, but I’ve heard comms there were terrible…

*(from RFCA edit: Vivo, I mean)

Yes, that was the list distributed today.

1 Like

Massively underrated comment :joy::joy::joy:

1 Like

I know it’s gone up to minister level, so potentially commercially impacting for RFCA/Contractors etc

4 Likes

Good.

I think I need to stick up for RFCA here.

the issue isn’t RFCA who have been equally screwed over.

The issue is the MoD ViVO contractor.

The CAA for my building & I were pulling our hair out trying to get the VIVO contractor to actually comply & turn up at the time they said.

The issue is caused by VIVO not by RFCA.

1 Like

fair point, my apologies - will edit!

1 Like

I have to point out that it’s taken RFCA 2 weeks to identify a second tranche of required closures.

They aren’t completely innocent. All it needed was a simple spreadsheet tracking sites and dates of inspections and regular works and they could have been ahead of this instead of being caught out.

Or a software solution.

1 Like

Isn’t Vivo (and the other companies) a contractor on behalf of RFCA, not MoD.

We’re under Vivo for our married quarter, absolutely shower of :poop: but on the plus side, we have a gas safety check every 9mths instead of the required 12 so we’ll never be out of date :roll_eyes:

But they are only going on what VIVO is telling them :man_shrugging:t2:

RFCA holding records saying what has been done, only finding out that this is incorrect when certificates have been received.

2 Weeks since the initial stand down came out.

The question is for these 21 was any work required or was it just sharing of evidence of compliance?

I’ve not seen the socials recently, but has anyone spoke to Alfie at FYB? He’s normally quite good at providing the right level of annoyance to get things moving.

4 Likes

Annoyingly, my main unit is under contract with VIVO anyways (perks of being by a military base, I guess)…so you’d think we would have been unscathed by this. Spent half my afternoon in between work trying to get somewhere with it, had to call a contact at the place we parade from to see if there’s anything they can do, but what with it being a Friday that the news hit, everyone was already starting to go off home sadly.

This is just an a way they have to attempt to absolve themselves for not managing the contract though.

This isn’t like an MOT where you have to wait until a specific window. If you’re chasing it so last minute that you lapsed while chasing or just made the assumption everything was fine in the absence of evidence, then that’s something that you are accountable for.

The contract change last year /18 months ago.

RFCA used a different contractor but was forced to use VIVO. It also prevents CAAs being used as handymen to fix door handles & change light bulbs etc

:man_facepalming:

Press release on the VIVO contract here

https://www.vivodefence.com/vivo-news/volunteer

It’s more a private eye article - sure they will love the details

1 Like