We’ve had some good progress on expanding the Sqn already, at no cost.
We’d been restricted by the fire capacity limit, even though we had enough physical space and a waiting list. The fire capacity limit has been reviewed and almost doubled, so we’ve got plenty of capacity for larger intakes and to grow the Sqn. Our limit now is enough staff attending for the required ratios.
3 Likes
ash
11 June 2026 12:48
365
…are you perhaps from my unit in disguise? /j
Very similar situation here, I imagine it’s a common theme
1 Like
All those fire limits that were based on average attendance rather than physical capacity finally being reviewed It’s an easy win.
yep, I’ve just had the FRA renewal visit this morning and the guy said current limit was just based on average attendance plus a little bit.
I’ve pushed for him to work out actual building capacity this time round and we’ll probably double our max occupancy limit.
1 Like
To add, I’ve just looked and found that Northamptonshire Fire and Rescue Service have created an interactive too to estimate your own occupancy limits.
Might be useful for some people to be able to then challenge or request a review.
…& then the final version of the Supervisory Care document will be issued, & you’ll need double the staff, even for your existing numbers!
4 Likes
And 30 by 30 is gone…
Subscription but currently free on Apple News if you have access.
Where are they citing for this? Nobody else seems to have got hold of it yet…
Not saying that would lie, just wondering how they got their hands on it.
WestlandScout:
And 30 by 30 is gone
Does it states that specifically?
I wouldn’t be surprised if it has been binned - the optics with loads of cadet force sqns shut has probably pushed this into the too hard to do.
it might be that CCFs remain in 30 by 30 but the rest will get knocked on the head.
It says the £70m plan to expand cadet numbers by 2030 will be ‘slowed down’.
Also forces housing refurb pushed back.
Not quoting directly due to copyright / paywall, don’t want to get into bother with the Mods.
It’s almost like he’s learnt absolutely nothing from the international embarrassment of only having one deployable destroyer and it not quite being ready to deploy.
1 Like
Looks like some successful lobbying by the Commando Force though, more money and new landing ships (joint with the Dutch)
2 Likes
As good as it is to be getting landing ships, it clearly isn’t more money but money cut from destroyers and frigates.
1 Like
Risk is everything is now drones just as a few years back everything was cyber.
You still need boots on the ground, or in the case of an island nation, ships at sea.
2 Likes
Mr_OZ
29 June 2026 09:06
380
Remember when everything was missiles and we didn’t need x,y and z.
1 Like
Turbo
29 June 2026 10:36
381
How do you ‘slow down’ a plan that isn’t even moving?
1 Like
Well if the plan is currently going backwards slowing down is probably a good thing
5 Likes
My guess is it is kicked down the road.
Or the funding is and we are expected to grow on the same, or a reduced, budget.
Not that I’d seen any indication of what the £70m was going to fund.
1 Like